Post-Tensioning Technical Support
We provide PT consulting support at any stage of your PT project:
- Value Engineering
- Do you need to change the location of a CJ or delay strip?
- Can using 0.6” diameter strand alleviate your congestion issue?
- Pre-planning
- We can create the agenda, run the meeting and follow up with the minutes.
- Review of PT contractual documents – RFI
- Some contract details may not be matching current code or PTI requirements
- Do you need to change a double end stress tendon to a single end stress tendon?
- QA / QC
- Embeds / PT coordination needs to be addressed early on.